The Old Gotthard Tunnel Route - Driver's Eye View
2018-10-01 | 112 minutes
Plot Summary
The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
Cast
Recommendations
-
Wormwood
-
Love, Antosha
-
The Swamp
-
Public Speaking
-
Room 666
-
No Half Measures: Creating the Final Season of Breaking Bad
-
Struggle: The Life and Lost Art of Szukalski
-
The Mole: Undercover in North Korea
-
Dark Days
-
The U.S. vs. John Lennon
-
Heart of a Dog
-
Charlie: The Life and Art of Charles Chaplin
-
Gilbert
-
My Mom Jayne
-
And the Oscar Goes To...
-
Directed by John Ford
-
Frida
-
Birth of the Living Dead
-
Transcendent Man
-
High School